Finishing Touches: Base & Case

You know the end is near when it’s time for baseboards and casings.

Design Choices

We removed the upstairs baseboards because it wasn’t our style.  We removed the main floor baseboards because they 1) weren’t our style and 2) weren’t installed very well.  So when looking at replacement trim you would think I would want to be overly involved to pick something that did fit our style.  Well, no.  Beyond the basics I didn’t really want to get myself dragged into a black hole of molding styles.  So I sat down with one catalog and picked out a few good trims.  J and I wanted taller baseboards and primed MDF so that narrowed down the choices quite a bit.  In the end we went with something a bit more on the intricate side but with clean lines.

trim

Budget

When making the budget we priced out everything from Home Depot.  We knew we would bargain shop but thought it was a good starting point to establishing a budget.  Well I’ll tell you this!  We budgeted $1.50/foot for casing and $2.00/foot for baseboards.  Well, well, well.  We decided to price-check Burton Lumber and we ended up getting casing for $0.66/foot and baseboards for $0.75/foot.  So yeah, shout out to Burton Lumber!

Painting

As previously noted, we were lucky enough to borrow a paint sprayer.  We laid out all the boards in the paint room aka garage.  It took a couple days to get through it all but everything was nicely sprayed and then moved inside to cure.  Moving 16-foot boards can be a little tricky; but they’re bendy so there’s that.

PHOTO_20170917_181021

PHOTO_20170917_181044
Close up to really appreciate the design

Installation

J and his dad spent one long day getting most of the upstairs trim installed.  They ended up running out of casing but there should be enough baseboard — it seems to be time that is in short supply.

The following weekend all the team was over so we got to work on caulking and spackling the gaps and nail holes.  I haven’t ever caulked anything before so I started in a back closet just in case I did a horrible job.  It wasn’t too difficult.  Squirt the caulk out, squish it into the gap with your finger while simultaneously smoothing it out, wipe the excess off so it’s nice and clean.  A few areas had huge gaps requiring a couple passes.  After wiping off the extra spackle it’s time to go around with touch-up paint.  Painting the nail holes and some of the larger joints really makes everything look finished and complete.  It took one whole weekend to get the upstairs done but totally worth the extra effort.  One of the issues with the original main floor baseboards was that no one took the time to caulk or spackle — it makes a difference!

Final Results

Enjoy these gorgeous shots.  The house looks much more home-like with trim and it doesn’t hurt that everyone involved put in the extra effort and love to make it look great.

PHOTO_20170924_161535PHOTO_20170924_161417PHOTO_20170924_161552PHOTO_20170924_161609

The upstairs is almost complete!! Carpet coming during the week, finish the baseboards and casing in the bathrooms, and then la fin!

Advertisements

Kitchen Cabinets

It’s been so long since I’ve posted!  Besides spending all weekends at the house I’ve started spending weekday evenings packing the apartment.  So I apologize for the delay in getting some of these pics up.

Shortly after J finished spraying all the kitchen cabinets, my dear sister and her husband dropped by to help and I put them to work installing the doors and drawer fronts.  They made fast work of it.  With the doors all up it doesn’t look too, too blue anymore.  I still feel that the blue-grey doors lean a little too blue but what are ya gonna do.

PHOTO_20170917_180848.jpg

Also, we “installed” a nice little microwave/mini fridge combo unit like you would see in a hotel.  Haha!  The real fridge was delivered today but we didn’t get any pics.  J said we were “adulting so hard” today with the delivery of a fridge.  It sticks out a little farther than I would like but I quickly got used to it.  I’m sure y’all will catch of glimpse of it in the final before & after posts that I’ve got planned.

Entryway Progress, cont.

I’m gonna make this one short and sweet.

The last week or so has really been focused on the main floor – especially the entryway.

Paint

With the help of many (me, J, S, R, and A), we were able to fully paint the entryway in one day.  As I’ve mentioned before, we chose Frost (Behr) which is a nice bright white that is a cool blue in shadows.  Here are a few shots:

PHOTO_20170917_180739PHOTO_20170917_180810

Also one of J, tapping into his acrobat-side to get up close and personal with the window trim.

PHOTO_20170917_161953

Tile

J, fortunately, had 8 days off from work this past week which was amazing timing.  He was able to get all the entryway tile cut, laid, and grouted.  First thing last Sunday before painting the entryway walls, we cleaned and sealed it.  All done!  The pictures don’t do it justice.  It’s really not quite as busy in person and really suits the space.

Railing

And one final picture.  The railing is coming along splendidly!  Here’s a just a little preview for you before the grand reveal.  The stair railing is the one budget-buster we’ve encountered and boy was it a big one!  But totally worth it.  This railing is absolutely fantastic!  I cannot wait to show you all the final railing.  It’s going to look freaking amazing; especially next to a ‘before’ pic.

20170922_174924.jpg

Super Active Sunday

Last Sunday was crazy busy.  We had all hands on deck!  There was the usual: me, J, little L, my mother-in-law S.  Then my sister and her husband came by, S & B.  Then a family friend, R.  So we had a full house and everyone was put to work.  And yes, watching miss L counts as work/helping with the house.  Here’s a quick rundown of some of the bigger, more interesting things accomplished:

1. Mudroom/Laundry area was prepped and painted. The same blue-tinted white as the main entryway, Frost (Behr), since it is also an entryway.

PHOTO_20170910_185217

2. Pantry cabinet was painted. This cabinet is not technically in the kitchen but we wanted it to tie into the kitchen rather than the mudroom/laundry area.  We decided to use paint to make that distinction – it is now the same color as the upper kitchen cabinets.

PHOTO_20170910_185209

3. Entryway was drywalled.  With the electrical rerouted and tucked away, it was time to put up the drywall.  You can read more about the entryway progress over here.

PHOTO_20170910_183254

4. Lower kitchen cabinet doors and drawer fronts were painted.  This was the main task for Sunday, but when everyone decided to make an appearance it became just one of the many tasks. Yay! We were able to borrow a paint sprayer from my MIL’s neighbor.  We set up a little spray booth in the garage and J went at it.  Two coats on the back, flipped over, two coats on the front.  We painted the backs first on purpose so that when they were flipped if they weren’t 100% cured any smudges would be on the back/inside the cabinet where it wouldn’t matter as much.

Getting a sprayer was hands down the best decision we’ve made throughout this whole renovation.  It cut the paint time by a quarter (or more!) and resulted in a smooth, even finish.

20170910_161128
The spray booth
20170910_161140
Inside the spray booth, half the fronts still drying.

 

20170910_161500
All the fronts, transferred inside to finish drying & curing in a more controlled environment (e.g. fewer bugs and less dirt).

J has been hard at work all this week so the updates will just keep on rolling in!  In the next couple weeks, we should be able to post the first few final before & afters, from start to finish.  I’m excited to see the side-by-side photos once things start coming together!

Entryway Progress

The entryway is still a bit of a work-in-process.  Compared to the upstairs it is still very much in demolition mode.  But here is a bit of what has been accomplished.

Stairs

We’ve removed all the old carpet from the stairs.  J ripped off the carpet and pulled up the tack strips.  I took a couple hours one morning pulling up all the staples.  It wasn’t too terrible.

The stairs themselves look in good enough condition that some patching and sanding will get them ready for paint.  The pie stairs, for some reason, don’t have bullnosed treads so we will have to get a couple retrofit treads to put there.  The plan – as it stands today and is subject to change – is to paint the risers white, the treads dark brown, then install a nice runner.  No ideas on runner colors or patterns yet.

Electrical

We had an electrician come by to quote moving the outlets and light switches that were in the old walls.  It was just over $1000!  One outlet literally just needed to rotate from the dining room wall to the new entryway wall – and it was quoted at nearly $200.  So … we said, thanks but no thanks.  We did a little electrical research, called some people familiar with electrical work, and just did it ourselves.  The wider entryway looks way wider now!  It looks great, you can really get a feel for the finished look.

PHOTO_20170902_163642PHOTO_20170902_163629

Drywall

Sunday was a frenzied day with lots of little activities going on all over.  One of those actives was drywall.  J and my brother-in-law, B, started on the new entryway walls.  It’s starting to look a lot more finished with just a little drywall!

Finished Tile!

The bathroom tile is completely finished.  And it looks amazing!

The kids’ bath was originally an off-white linoleum that wasn’t in terrible shape.  It had definitely seen better days but was liveable.  However, the new tile looks freaking awesome.  A hundred times better than the old linoleum.

The master water closet was originally linoleum tile that was no longer stuck down.  It looked absolutely horrible.  Brown-beige, old linoleum that was peeling and shifting.  We used the free tile we found in the garage and it actually looks pretty good.  A thousand times better!

Since the square footage of each bathroom was fairly small we decided to get just one grout color.  I’d say it turned out great in each room.  In the kids’ bath it matches the tile, a sort of neutral gray.  In the master water closet it somehow looks blue and really pulls the blue color out of the tile and the wall.

And with that, this is probably the last post about the upstairs tile.  There will be many (well, probably just a few) about the main stairs tile once that gets underway.

Finishing Touches

While some areas of the house still look like it’s demo day, other areas are nearing the finish line.  Upstairs, the bedrooms are almost set!  Carpet is coming to measure on the 13th; hopefully installing the week of the 18th.  The just leaves some finishing touches.  J has been switching out the older, yellowed outlets and switches for new, white.  At first, I was skeptical that it would be worth the effort but I’ll let the pictures speak for themselves.

We also installed brand new faux wood blinds in each of the bedrooms.  They’re a small touch but really make it look more like home.

Last but not least, the master got a new ceiling fan that actually works.  The old one attempted to spin but made a god-awful noise which was kind of frightening and definitely not conducive to a good night’s sleep.  After looking at quite a few models we went with a classic look.  Initially we were both drawn to more modern styles but in the end wanted at least 2 lights.  The 3 bulb style we ended up with light up this larger room wonderfully.

The kids’ rooms were suppose to each get one of the new lights below, but they’ve been back-ordered until late October.  Wah-wah.  Moving day is fast approaching so I guess little L will just have to live in the dark for a month or so — or I suppose we could just find her a floor lamp for now.

Progress Lighting

Paint: Main Floor, part 2

I’m getting behind on posting.  I’m sorry!  All of this happened last weekend — it was such a huge transformation it’s a mystery why I forgot to post about it.  But here we go.  Paint colors for the main floor!  If you recall, the swatches were revealed a few weeks ago in Paint Samples.  We ended up not going with Sherwin Williams so we had to pick out paints again at Home Depot but since we already had the colors it was simple to just find a match.  Let our paint transformation, main floor edition, begin!

Ceilings

J managed to paint the entryway ceiling with only himself and a ladder.  I have no idea how he accomplished this in a 2-story entryway but it happened.  And it looks great!

20170824_144757

Dining Room

This isn’t the best picture of the dining room but here’s a mediocre before & after.  It went from thickly textured yellow-beige to smooth brown.  I think it’s a nice mature, calming color perfect for a family dining room.  With dark walls and dark floors we’re going to have to be careful about furniture and decor so as to brighten the room, not make it even darker.

20170620_102621-COLLAGE
Before; After – Moleskin (Behr)

Living Room

The living room went from thickly textured white to an interesting pale green.  In some lights it looks avocado in others a light lime green.  When we first started painting it on it looked really yellow-green.  I called it “newborn poop” green.  But as it dried it turned out to be more what we were looking for.  I know it’s not for everyone but we like it.  I just hope once our existing furniture and decor moves in that it all coordinates.  I don’t have it in the budget to redo furniture and decor just yet!

20170620_102722-COLLAGE
After – Fennel Seed (Behr); Before

Playroom

The playroom is mostly the same Fennel Seed color as the living room.  Being two connected rooms we wanted the same color to flow between them.  I wanted to add a bit of a playful, fun feature to the playroom though.  So we went with an accent wall.  At first we went with Carraway Seed (Behr) which was two colors darker.  The difference was so subtle that it basically looked like the same color wall just with a shadow.  So we went back to Home Depot for Dash of Oregano which is four colors darker than Fennel Seed.  And here you go!  A for-sure accent wall, no doubts about it.

20170620_102815-COLLAGE
Before; After – Dash of Oregano (Behr)

Also, we had to deal with the mess left behind from removing the chair rail (Paint: Main Floor).  As you can see in the picture above, it turned out just fine.  Close up you might be able to see somethings — if you know what to look for.  Otherwise, it’s a perfectly plain wall again.

Kitchen

The kitchen was mostly cutting-in with all the little sections too small for the roller and around all the cabinetry.  It was probably the most time consuming room (if you don’t count the repainting of the accent wall).  It’s a fairly bold blue but J loves it.  I think it will work out well once everything else comes together.

20170620_102857-COLLAGE
Before; After – Reef Blue (Behr)

All Together

And last but not least.  Here’s a shot of all the colors together.  It was important to both J and I that all our color ideas fit together well so even though the main floor is colorful it still has a cohesive feel to it.  I think we accomplished that goal.

PHOTO_20170827_142257